Bomag BW135AD-5 Operating And Maintenance Instructions Tandem Vibratory Roller 00820191EN

$24.00

Factory Operating And Maintenance Instructions For Bomag Tandem Vibratory Roller. Manual For Owners And Operators. It Contains Important Information And Instructions For Maintenance Description Of The Functions And Capabilities Of The System. Description Of Possible Faults / Problems And Their Solution.

Photo 7 - Bomag BW135AD-5 Operating And Maintenance Instructions Tandem Vibratory Roller 00820191EN
Bomag BW135AD-5 Operating And Maintenance Instructions Tandem Vibratory Roller 00820191EN $24.00
  • Unlimited Lifetime Access
  • Instant Download
  • Ready for Print
Guaranteed Safe Checkout

payment methods

Factory Operating And Maintenance Instructions For Bomag Tandem Vibratory Roller. Manual For Owners And Operators. It Contains Important Information And Instructions For Maintenance Description Of The Functions And Capabilities Of The System. Description Of Possible Faults / Problems And Their Solution.

Format: PDF
Language: ENG
Pages: 244
Number: 00820191 (april 2018)
Bookmarks: Yes
Searchable: Yes

Model

Bomag Tandem Vibratory Roller
BW135AD-5

Contents

-INTRODUCTION
Foreword
Machine Type Plate And Engine Type Plate
-TECHNICAL DATA
Noise And Vibration Data
-CONCERNING YOUR SAFETY
Basic Prerequisites
Definition Of Responsible Persons
Fundamentals For Safe Operation
Handling Fuels And Lubricants
Loading / Transporting The Machine
Start-Up Procedure
Driving The Machine; Working Operation
Refuelling
Regeneration Of Exhaust Gas Aftertreatment System
Emergency Procedures
Maintenance Work
Repair
Signage
-INDICATORS AND CONTROL ELEMENTS
Driver’s Stand
Outside Of Machine
Engine Compartment
-CHECKS PRIOR TO START UP
Notes On Safety
Visual Inspections And Function Tests
Checking The Engine Oil Level
Checking The Fuel Level; Topping Up Fuel
Checking The Hydraulic Oil Level
Checking The Hydraulic Oil Filter
Checking The Coolant Level
Checking The Air Filter
Checking The Water Level, Topping Up
Checking, Adjusting The Scrapers
-OPERATION
Setting-Up The Work Place
Electronic Immobilizer
Starting The Engine
Travel Operation
Working With Vibration
Water Spraying System
Crabwalk
Regeneration Of Exhaust Gas Aftertreatment System
Parking The Machine In Secured Condition
Edge Cutter
Chip Spreader
Emergency Procedures
-LOADING / TRANSPORTING THE MACHINE
Prepare For Transport
Loading The Machine
Lashing The Machine To The Transport Vehicle
Loading By Crane
After Transport
-MAINTENANCE
Preliminary Remarks And Safety Notes
Preparations/Concluding Work
Fuels And Lubricants
List Of Fuels And Lubricants
Running-In Instructions
Maintenance Table
Every 50 Operating Hours
Every 250 Operating Hours
Every 500 Operating Hours
Every 1000 Operating Hours
Every 2000 Operating Hours
Every 3000 Operating Hours
As Required
-SETTING UP / REFITTING
Manually Adjusting The Crabwalk
Edge Cutter – Installing Tool
Mounting / Removing The Chip Spreader
-TROUBLESHOOTING
Preliminary Remarks
Starting The Engine With Jump Leads
Fuse Assignment
Fault Code Display
Engine Faults
Trouble Shooting Economizer
-DISPOSAL
Final Shut-Down Of Machine

What you get

You will receive PDF file with high-quality manual on your email immediately after the payment.

Reviews

There are no reviews yet

Only logged in customers who have purchased this product may leave a review.