Case CX145CSR Tier 4 Service Manual Crawler Excavator 47395870A

$49.00

Factory Service Manual For Case Crawler Excavator. Manual Contains Illustrations, Instructions, Diagrams For Step By Step Remove And Install, Assembly And Disassembly, Service, Inspection, Repair, Troubleshooting, Tune-Ups.

Photo 9 - Case CX145CSR Tier 4 Service Manual Crawler Excavator 47395870A
Case CX145CSR Tier 4 Service Manual Crawler Excavator 47395870A $49.00
  • Unlimited Lifetime Access
  • Instant Download
  • Ready for Print
Guaranteed Safe Checkout

payment methods

Factory Service Manual For Case Crawler Excavator. Manual Contains Illustrations, Instructions, Diagrams For Step By Step Remove And Install, Assembly And Disassembly, Service, Inspection, Repair, Troubleshooting, Tune-Ups.

Format: PDF
Language: English
Pages: 2051
Number: 47395870A (july 2012)
Bookmarks: Yes
Searchable: Yes
Wiring Diagrams: Yes
Hydraulic Diagrams: Yes

Model

Case Crawler Excavator
CXI45CSR
Tier 4

Contents

-GENERAL INFORMATION
Safety
ROPS Judgment Method
Bolt and Nut Tightening..
-ENGINE
Removal and Installation of Engine Assembly
Removal And Installation Of The Fuel Cooler Engine Inter-Cooler Radiator And Oil Cooler
Removal and Installation of Turbo Charger
Removal and Installation of EGR Valve
Removal and Installation of Top Cover
Removal and Installation of Muffler
Primary Specifications
Removal and Installation of Cylinder Head
Removal and Installation of Cylinder Block
Lubrication System
Removal and Installation of Exhaust Manifold
Removal and Installation of Fuel Supply Pump
-FUEL SYSTEM
Removal and Installation of Fuel Tank
Removal and Installation of Fuel Supply Pump
Removal and Installation of Common Rail Assembly
-ELECTRICAL SYSTEM
Electrical and Engine Basic Functions
Service Support
Function, Structure, Operation
Symptom
Functional Inspection
Maintenance Precautions
Removal and Installation of Starter Motor
Removal and Installation of Alternator
Preheating System
Electrical Equipment Layout Diagram
-UNDERCARRIAGE
Removal and Installation of Shoe Assembly
Removal and Installation of Shoe Plate
Assembly and Disassembly of Upper Roller
Assembly and Disassembly of Lower Roller
-DRIVE TRAIN
Removal and Installation of Travel Motor
Assembly and Disassembly of Travel Motor
Removal and Installation of Swing Unit
-UPPERSTRUCTURE HYDRAULICS
Overall View
Port Diagram
Pressure Measurement and Adjustment Procedures
Hydraulic Pump Flow Measurement Procedures
Air Bleed Procedure
-UPPERSTRUCTURE
Removal and Installation of Hydraulic Oil Tank
Removal and Installation of Control Valve
Removal and Installation of Arm Cylinder
Removal and Installation of Travel Remote Control Valve
Procedures for Assembly and Disassembly of Hydraulic Pump Main Unit
Pump Main Unit Maintenance Standards
Procedures for Assembly and Disassembly of Control Valve

What you get

You will receive PDF file with high-quality manual on your email immediately after the payment.

Reviews

There are no reviews yet

Only logged in customers who have purchased this product may leave a review.